華星東方承建的山西省呂梁市汾陽垃圾焚燒發(fā)電項目煙氣凈化工程于2023年11月28日通過72+24小時試運行。
The flue gas cleaning project of the Fenyang waste incineration power generation project in Luliang City, Shanxi Province, undertaken by our company, passed the 72+24 hour trial operation on November 28, 2023.
該項目設(shè)計建設(shè)1×750t/d垃圾焚燒爐生產(chǎn)線,配備2×6MW汽輪發(fā)電機組。煙氣處理采用“半干法(旋轉(zhuǎn)霧化半干反應(yīng)塔)+干法(噴射消石灰)+活性炭噴射+袋式除塵器”的煙氣處理組合工藝,為我司設(shè)備供貨工程。This project designs and builds a 1×750t/d waste incinerator production line equipped with 2×6MW turbine generator sets. The flue gas cleaning adopts the flue gas treatment combination process of "semi-dry method (rotary atomization semi-dry reaction tower) + dry method (slaked lime injection) + activated carbon injection + bag dust collector", which is our company's equipment supply project.
華星東方在山西省的業(yè)績涵蓋包括:陽泉、太原、呂梁汾陽、晉中、運城、運城夏縣、忻州、大同等多個項目。
Huaxing East Co's performance in Shanxi Province covers multiple projects in Yangquan, Taiyuan, Luliang Fenyang, Jinzhong, Yuncheng, Yuncheng Xiaxian, Xinzhou, and Datong.
評論